Customization: | Available |
---|---|
Type: | Clay Dry Sand |
Casting Method: | Thermal Gravity Casting |
Still deciding? Get samples of US$ 10/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Crane Component Pulley Block Fittings Housing
Ductile Iron
Sand casting
Himile Precision Forging Technology Co., Ltd.
Process | Sand Casting, Investment Casting | |
Material | Malleable Iron , Ductile Iron | |
Weight | 0.1Kg~20Kg | |
Testing instrument | composition testing | Spectrometer, Metallographic microscope |
Performance testing | Hardness tester, Tensile testing machine | |
Size Measuring | Vernier Caliper, Depth Caliper, feeler gauge,Thread Gauge , Height Gauge | |
Roughness | Ra1.6~Ra6.3 | |
Machining Equipment | CNC Center , CNC Machines, Turning, Drilling, Milling, Boring machine,Grinding Machines, | |
Wire EDM,Laser Cutting&Welding, Plasma Cutting &Welding, EDM etc. | ||
Quality control | Sampling inspection of raw materials and semi-finished products, 100% Inspection of finished products | |
Surface Treatment | Sand Blast , Painting, Coating, Galvanized , Hot Galvanized | |
Production Capacity | 60000T / Years | |
Lead Time | Normally 30 - 45 Days. | |
Payment Terms | T/T , L/C | |
Material Standard | ASTM , AISI , DIN , BS, JIS, GB, | |
Certification | ISO9001:2008, IATF16949:2016 |
At Himile, we prioritize product quality for our longevity. Continuous improvement is crucial for our success.
(Insert relevant testing equipment pictures here)
At Himile Precision Forging Technology Co., Ltd., we strictly adhere to ISO9001 and TS16949 quality standards. Our production site follows 5S lean production management practices to ensure efficiency and quality.
5S Lean Production
The Sales department at Himile Precision Forging Technology Co., Ltd. accepts drawings or samples from customers and forwards them to the technical department. The technical department confirms material consumption and the manufacturing process. The Production department, Purchasing department, and Finance department collaborate to determine costs. The Sales department provides the customer with a quotation for the product. Upon agreeing on price and delivery date, both parties sign the drawing through the Sales department for final confirmation. The customer pre-pays the mold fee, and the Sales department informs the Finance department about the deposit status while the Production department schedules production. A preproduction sample is sent to the customer for confirmation. After sample approval, the customer pays the deposit. Small batch orders are managed by the Sales department. Following small batch confirmation, large batch orders are processed for production by the Production department. The Sales department oversees product delivery and customer receipt upon production completion. All documents provided by the Sales department are handed to the Finance department post-product departure for payment confirmation. Once the contract execution is finalized, the Finance department records and files it.
We are a leading manufacturer specializing in forging products, casting products, and machining capabilities. Our high-quality products cater to various industries in equipment manufacturing.
Are you a trading company or a manufacturer?
We are a manufacturer specializing in forging, casting, and machining.
What series products do you offer?
Our focus is on ferrous metal processing through casting, forging, and machining.
Do you provide samples?
Yes, we offer samples with freight costs covered by customers to show mutual cooperation.
What is your minimum order quantity?
Minimum order quantity varies based on product features like material, weight, and construction.
What is the lead time?
Lead time for new dies or molds and samples is 30-45 days, with large batch production within the same timeframe.
What payment methods do you accept?
We accept payment via T/T or L/C, with a 30% deposit and 70% balance against the copy of B/L.